As of 15/1/14 i am about half way through my filming, so far i have collected a los of shots that will be used at the beginning of my trailer which will be used in black and white. Most of the shots are going to be used for quick cuts mostly as i don't really want to spend a long time on what are basically flash backs that will be used within the first 30 seconds of my trailer.
I should have everything all filmed and sorted within 2 weeks depending on the weather if it happens to rain it will ruin my continuity so fingers crossed i will have clear weather to film the rest of my trailer.
No comments:
Post a Comment